外墙外保温系统如何提高整体质量
来源:/ 日期:2018-10-24 发布人:admin

负责现场施工的队伍必须制定详细的外墙外保温施工技术和技术要求。建筑外墙施工前一周,施工队技术人员必须对施工人员进行全方位专业施工和安全施工培训,并为甲方提供详细的施工技术依据。掌握综合技术要求,确保施工过程中严格按照规范施工进行。

The team responsible for on-site construction must formulate detailed external wall insulation construction technology and technical requirements. A week before the construction of the exterior wall, the technical personnel of the construction team must carry out all-round professional construction and safety construction training for the construction personnel, and provide detailed technical basis for Party A. Grasp the comprehensive technical requirements, ensure that the construction process is strictly in accordance with the standard construction.

真空绝热板或其他甲类绝热材料和辅助隔热材料必须符合建筑设计和设计的要求,符合现行建筑节能标准;任何单位和个人不得改为外部世界。外墙保温系统或节能设计标准的降低,为了防止外墙保温确实需要更换。根据设计要求,原设计单位必须通过质量监督机构的资质,根据批准的变更设计文件,组织变更手续,组织施工。

Vacuum insulation panels or other Class A insulation materials and auxiliary insulation materials must meet the requirements of architectural design and design and meet the current building energy-saving standards; no unit or individual may change to the outside world. The external wall insulation system or energy saving design standard is reduced, in order to prevent the external wall insulation really need to be replaced. According to the design requirements, the original design unit must pass the qualification of the quality supervision organization, according to the approved change design documents, organize the change procedures, organize the construction.

A1级防火保温材料

材料管理人员应严格控制外墙保温等外墙保温材料,如保温板等外墙外保温系统,产品必须符合节能技术的政策要求。外墙保温材料必须有生产厂家的产品合格证和性能检验报告和密封件。所有材料的规格、品种和性能均符合设计规范和有关规定。进入现场后,应按照施工规则重新检查材料,严禁违禁材料。

Material management personnel should strictly control the external wall insulation materials such as external wall insulation, such as insulation board and other external wall insulation system, products must meet the policy requirements of energy-saving technology. External wall insulation materials must have manufacturer's product qualification certificate and performance inspection report and seal. The specifications, varieties and properties of all materials conform to the design specifications and relevant regulations. After entering the scene, the materials shall be re examined according to the construction rules, and prohibited materials shall be strictly prohibited.

在施工前,应完成窗户和框架的相关部件的安装,每个窗的尺寸和位置必须通过质量部门的验收达到设计要求和质量要求。在施工过程中,必须关闭外保温系统的接缝。做好变形防治工作。工作温度在15℃以上,最适合外墙保温,空气相对湿度小于80%。

Before construction, the installation of windows and related parts of the frame should be completed. The size and position of each window must meet the design requirements and quality requirements through the acceptance of the quality department. During the construction process, the joints of the external thermal insulation system must be closed. Do well in prevention and control of deion. The working temperature is above 15 C, which is most suitable for external wall insulation, and the relative humidity of air is less than 80%.


上一篇:保温装饰板出现裂缝的原因有哪些
下一篇:最后一页

 
在线咨询
全国咨询热线
18769786220
友情链接:东方彩票平台  秒速时时彩开奖  盛世彩票平台  盛世彩票官网  幸运彩票官网  云鼎彩票官网  盛兴彩票  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!